Connect with us

Hi, what are you looking for?

Investing

Edjudina Gold Project, WA – Permitting Application to Mine Neta Prospect Lodged

Gibb River Diamonds Limited (ASX:GIB) has announced Edjudina Gold Project, WA – Permitting Application to Mine Neta Prospect Lodged.

Gibb River Diamonds Limited (‘GIB’ or the ‘Company’) is pleased to announce that a Mining Proposal covering the Edjudina Gold Project (GIB 100%) has been lodged with the West Australian Mines Department (DEMIRS) The aim of the ‘Mining Proposal For Small Mining Operations’ is to permit mining of the Neta Prospect, part of the Edjudina Gold Project, which is on granted mining lease M31/495 The Indicated and Inferred Resource JORC resource at the Neta Prospect is 378,000 tonnes @1.9 g/t for 24,000 Oz Au and includes an Indicated Resource of 110,000 tonnes @ 2.2g/t for 8,000 Oz Au1 It is the primary focus of GIB to mine or otherwise monetise this Neta resource as soon as is practicable. The lodging of this Mining Proposal is an important step forward in achieving this aim Once granted, the Mining Proposal will permit for a Mine and Haul operation to be conducted at the Neta Gold Prospect, using toll treatment at a third-party mill (pending commercial contracts). This is the Company’s current priority. The Company is currently communicating with the WTAC Native Title group to finalise a date for a heritage survey to be conducted at the Edjudina Project. It is anticipated that this heritage survey will take place sometime in April 2025. This survey will assist in facilitating both mining at the Neta Prospect and the drilling of new exploration targets in the Company’s recently acquired and highly prospective mining lease M31/481, adjacent to the proposed Neta mining area Discussions are ongoing with various West Australian groups which specialises in mine, haul and toll milling gold operations

NB: it is anticipated that subsequent to the commencent of mining, from time to time, that additional permitting will be required at Edjudina. It is not the intention of GIB to report to the ASX permitting applications, or re-submissions, which the Company does not consider to be material, but are a routine part of permitting mining operations.

About the Edjudina Gold Project

GIB’s Edjudina Gold Project is 145km north east of Kalgoorlie and is located in the heart of the Eastern Goldfields of WA. The project comprises multiple parallel lines of nearly continuous historic gold workings over a 13km strike in which high grade veins have been worked2. A haul road owned and operated by Northern Star Resources Limited runs through the north of the project directly to the Carosue Dam milling complex 45 km to the south.

Click here for the full ASX Release

This post appeared first on investingnews.com

You May Also Like

Editor's Pick

In Risky Business: Why Insurance Markets Fail and What to Do About It (Yale University Press, 2023), economists Liran Einav (Stanford), Amy Finkelstein (MIT),...

Editor's Pick

Protesters in Brussels participate in the Walk for Your Future climate march ahead of COP27. United Nations climate conferences typically reach their peak just...

Editor's Pick

Entrepreneurs are transforming the way society makes and distributes valuable things. There will be (and already are) important consequences for the way we work...

Editor's Pick

For years the North Korean playbook was obvious to the world. The Democratic People’s Republic of Korea wanted to be the center of attention....